Sites M0001-M0004
Sites M0001-M0004
复制标题
站点 M0001-M0004
DOI:
10.2204/iodp.proc.302.104.2006
复制
发表时间:
2006
期刊:
影响因子:
--
通讯作者:
Masanobu Yamamoto
中科院分区:
文献类型:
--
作者:
J. Backman;K. Moran;D. McInroy;H. Brinkhuis;S. Clemens;T. Cronin;G. Dickens;F. Eynaud;J. Gattacceca;M. Jakobsson;R. Jordan;M. Kaminski;Jonathan King;N. Koç;N. Martinez;J. Matthiessen;T. C. Moore;Jonaotaro Onodera;M. O’Regan;H. Pälike;B. Rea;D. Rio;T. Sakamoto;David C. Smith;R. Stein;K. S. John;I. Suto;N. Suzuki;Kozo Takahashi;Mahito Watanabe;Masanobu Yamamoto
The Vidar Viking came under contract on 22 July 2004, when mobilization began in Aberdeen, Scotland. Mobilization in Aberdeen included two major installations: a moonpool and a full coring/ drilling spread. By 26 July, all equipment for the Vidar Viking had arrived, including information technology equipment bound for the Oden. The derrick was load-tested and certified. The Vidar Viking took on a full complement of fuel at Aberdeen.