Designing a pull-type parts procurement system for international co-operative knockdown production systems

Designing a pull-type parts procurement system for international co-operative knockdown production systems
复制标题

国际合作组装生产体系拉动式零部件采购体系设计

DOI:
10.1080/00207549208942898
复制
发表时间:
1992
影响因子:
9.2
通讯作者:
R. Muramatsu
R. Muramatsu
中科院分区:
工程技术2区
文献类型:
--
作者:
Shusaku Hiraki;K. Ishii;Katsuhiko Takahashi;R. Muramatsu

文献摘要

被引文献

相似文献

本文提出了一个设计国际合作拆装生产系统零部件采购系统的概念框架。建立了两种拉式零件采购模型,分别包含修正上一时期遗留积压的缺货函数和补偿零件短缺的紧急交货,并分析了紧急交货对缺货概率和缺货量均值的影响。利用这些结果,提出了一种计算程序,用于确定经济缓冲库存水平和紧急交货率或水平,以保证给定性能水平下的系统可靠性,并使库存和紧急采购成本之和最小。
In this paper, a conceptual framework for designing a parts procurement system for international co-operative knockdown production systems is proposed. Two types of pull-type parts procurement models that contain both a backorder function which modifies the backlog carried over from the last period and emergency delivery compensating for component part shortages, are formulated, and the effects of emergency delivery on the probability of stock out and the mean value of shortage quantity is analysed. Using these results, a computational procedure for determining an economic buffer stock level and emergency delivery rate or level which assures system reliability for a given performance level and minimizes the sum of inventory and emergency procurement costs, is presented.