Designing a pull-type parts procurement system for international co-operative knockdown production systems
Designing a pull-type parts procurement system for international co-operative knockdown production systems
复制标题
国际合作组装生产体系拉动式零部件采购体系设计
DOI:
10.1080/00207549208942898
复制
发表时间:
1992
影响因子:
9.2
通讯作者:
R. Muramatsu
中科院分区:
文献类型:
--
作者:
Shusaku Hiraki;K. Ishii;Katsuhiko Takahashi;R. Muramatsu
In this paper, a conceptual framework for designing a parts procurement system for international co-operative knockdown production systems is proposed. Two types of pull-type parts procurement models that contain both a backorder function which modifies the backlog carried over from the last period and emergency delivery compensating for component part shortages, are formulated, and the effects of emergency delivery on the probability of stock out and the mean value of shortage quantity is analysed. Using these results, a computational procedure for determining an economic buffer stock level and emergency delivery rate or level which assures system reliability for a given performance level and minimizes the sum of inventory and emergency procurement costs, is presented.