Installation and Radiation Maintenance Scenario for J-PARC 50 GeV Synchrotron
Installation and Radiation Maintenance Scenario for J-PARC 50 GeV Synchrotron
复制标题
J-PARC 50 GeV 同步加速器的安装和辐射维护场景
DOI:
10.1109/pac.2005.1590580
复制
发表时间:
2005
期刊:
影响因子:
--
通讯作者:
Y. Takiyama
中科院分区:
文献类型:
--
作者:
M. Yoshioka;H. Kobayashi;T. Oogoe;Y. Takeuchi;Y. Watanabe;Y. Kuniyasu;H. Oki;Y. Takiyama
The accelerator tunnel of the J-PARC 50 GeV Synchrotron is still under construction, and will be completed at the end of 2006. Installation of accelerator-components is scheduled to start in July 2005 in parallel with civil and utility construction, and beam commissioning will be started in January 2008. This document describes how to install accelerator components in the tunnel and a radiation maintenance scenario.