Simultaneous Resource Allocation of Multi Resource Constrained Production

Simultaneous Resource Allocation of Multi Resource Constrained Production
复制标题

多资源约束生产的同时资源分配

DOI:
10.1109/issm.2018.8651163
复制
发表时间:
2018
期刊:
Proceedings of The International Symposium on Semiconductor Manufacturing 2018
影响因子:
--
通讯作者:
H. Motomiya
H. Motomiya
中科院分区:
--
文献类型:
--
作者:
S. Arima;H. Motomiya

文献摘要

相似文献

针对多资源受限生产的同时资源分配问题,提出了QP2LP(*Quadratic Assignment Problem to Line Programming)的两个扩展。首先是QP2LP-TC法在合理的时间内终止方案,寻找较好的可行方案。第二种是混合生产MTO和MTS产品的Stepwise-QP2LP方法。通过对实际半导体工厂最终的晶圆测试结果进行性能评估,两种方法都能达到多目标的目标,因为这两种方法都能在满足单个产品交货期的情况下,有效地利用多类型夹具来实现较好的解决方案。
This paper introduced two extensions of QP2LP (*Quadratic assignment Problem translated to Linear Programming) for the simultaneous resource allocation problem of multiple resource constrained production. First was QP2LP-tc method to terminate the program in a reasonable time to find a better feasible solution. Second was the Stepwise-QP2LP method for a mixed production of the MTO and the MTS products. As the result of the performance evaluations in the final wafer test of actual semiconductor factory, both methods could achieve the multi-objective goal, because those achieve better solutions under satisfying due-date of individual products by utilizing the multi-type jigs effectively.