The Monitoring Of World Heritage Sites DuringConstruction Works In Their Vicinity: The Case OfCasa Milà And Of The Church Of SagradaFamilia In Barcelona, Spain
The Monitoring Of World Heritage Sites DuringConstruction Works In Their Vicinity: The Case OfCasa Milà And Of The Church Of SagradaFamilia In Barcelona, Spain
复制标题
世界遗产地周边建筑工程期间的监测:以西班牙巴塞罗那米拉之家和圣家族教堂为例
DOI:
10.2495/str110301
复制
发表时间:
2011
期刊:
影响因子:
--
通讯作者:
T. Bakeer
中科院分区:
文献类型:
--
作者:
W. Jäger;T. Burkert;B. Boekhoff;T. Bakeer
World Heritage Sites declared by UNESCO can be in danger when construction works are planned and implemented in their vicinity. Works above the ground are mostly excluded by the declaration due to the visible influence on the appearance of the World Heritage Building or Complex. However, in the case of street works or of the execution of underground buildings there is no limitation or prescription. These works can influence the stability or the load bearing behaviour of the building during the execution or afterwards. That’s why it is necessary to consider the interaction of the planned works with the monument. The time during the construction should also be considered for long term effects. The problems which can arise in such a case will be explained on the example of the construction of the high-speed train tunnel in the vicinity of Temple Sagrada Familia and to Casa Milà in Barcelona Spain. At the end conclusions are drawn for future declarations of World Heritage Monuments and necessary monitoring missions. The responsibility for the declaration as well as for the monitoring lies in the hands of the state site of the respective country which should consider the outcome of this case study very early.