Status of Superconducting Cable Demonstration Project in Japan
Status of Superconducting Cable Demonstration Project in Japan
复制标题
日本超导电缆示范项目现状
DOI:
10.1109/tasc.2010.2092744
复制
发表时间:
2011
影响因子:
1.8
通讯作者:
T. Hara
中科院分区:
文献类型:
--
作者:
S. Honjo;T. Mimura;Y. Kitoh;Y. Noguchi;T. Masuda;H. Yumura;M. Watanabe;M. Ikeuchi;H. Yaguchi;T. Hara
The HTS cable demonstration project, called the Yokohama Project, supported by Ministry of Economy, Trade and Industry and the New Energy and Industrial Technology Development Organization, was initiated in Japan in 2007. The aim of this project is to operate a 66 kV, 200 MVA high-temperature superconducting (HTS) cable in a network of the Tokyo Electric Power Company to demonstrate cable reliability and stable operation. Total project period was changed from 5 years to 6 years. Chosen as the demonstration site was the Asahi substation in Yokohama. Based on the analysis of the network conditions of the demonstration site, specifications of the HTS cable system were determined. Element technologies were developed and various preliminary tests using short core samples were conducted to confirm the HTS cable design. A 30-meter HTS cable system was manufactured and tested prior to initial demonstration tests. Long-term demonstration tests of the HTS cable system in an actual grid at the Asahi substation are scheduled to be started in 2011.
DOI:
--
发表时间:
2018
期刊:
影响因子:
--
作者:
Lin Nyan;Kurkoski Brian M.;TAN Yasuo;LIM Yuto;Takanobu Kiss
通讯作者:
Takanobu Kiss