Simulation of sequential batch reactor (SBR) operation for simultaneous removal of nitrogen and phosphorus
Simulation of sequential batch reactor (SBR) operation for simultaneous removal of nitrogen and phosphorus
复制标题
DOI:
10.1007/s004499900188
复制
发表时间:
2000-11
期刊:
影响因子:
--
通讯作者:
H. Chang;R. Moon;B. Park;Seong-Jin Lim;D. Choi;W. Lee;S. Song;Yong-Hee Ahn
中科院分区:
文献类型:
--
作者:
H. Chang;R. Moon;B. Park;Seong-Jin Lim;D. Choi;W. Lee;S. Song;Yong-Hee Ahn
Modeling of the operation of sequential batch reactor (SBR) was performed to find out optimum design parameters for simultaneous removal of nitrogen and phosphorus in a small-scale wastewater treatment plant. The models were set up with material balances on SBR operation and Monod kinetics. The model parameters were obtained to best fit the experimental results in a small scale SBR. The models were useful in optimizing hydraulic retention time (HRT) and successfully simulated operations of SBR in a larger scale. Especially the model predicted well the reactions occurring in the filling period as well as the effect of dilution, and evaluated the performance of SBR process under diverse operating conditions.