Optimal Scheduling of Multiple Feedstock Batch Biogas Production Systems
Optimal Scheduling of Multiple Feedstock Batch Biogas Production Systems
复制标题
多原料间歇式沼气生产系统的优化调度
DOI:
--
复制
发表时间:
1986
期刊:
影响因子:
--
通讯作者:
B. Deuermeyer
中科院分区:
文献类型:
--
作者:
G. Curry;B. Deuermeyer
Abstract Biomass to methane production systems have the potential of supplying 25% of the yearly national natural gas demand. The production systems associated with this conversion process are anaerobic digestion facilities. The optimal operation of a batch biomass digester system requires the scheduling of all batches from multiple feedstocks during a fixed time horizon. A significant characteristic of these systems is that the feedstock decays in storage before use in the digester system. The optimal batch residence times in the digester must account for the production rate as well as the decay rate of stored biomass. The availability times, biomass quantities, biogas production rates and storage decay rates must all be taken into account for maximal biogas production to be achieved during the planning horizon. This paper addresses the scheduling of both single and multiple feedstocks in a single digester system. The single feedstock batch scheduling time problem is solved by a dynamic programming algor...