Soft Constraint-based simulation of execution strategies in building engineering

Soft Constraint-based simulation of execution strategies in building engineering
复制标题

建筑工程中基于软约束的执行策略模拟

DOI:
10.1057/jos.2010.8
复制
发表时间:
2010
影响因子:
2.5
通讯作者:
Bargstädt
Bargstädt
中科院分区:
工程技术4区
文献类型:
--
作者:
Beißert;König;Bargstädt

文献摘要

参考文献

被引文献

相似文献

在建筑工程中,可以使用不同的策略来安排建筑项目的执行过程。目前,这些策略还没有充分正式化,并考虑施工进度。本文提出了一种通过使用软约束表示来建模和模拟执行策略的概念。特别是,GRASP启发式应用在一个基于约束的模拟方法,以提高施工进度,通过观察完善的执行策略。此概念的优势显示在避免污染和人为应变因素策略中。
In building engineering different strategies can be used to schedule the execution processes of building projects. Currently, these strategies have not yet been sufficiently formalized, and considered for construction scheduling. This paper presents a concept for modelling and simulating execution strategies by using Soft Constraint representations. In particular, the GRASP heuristic is applied within a constraint-based simulation approach to improve construction schedules by observing well-established execution strategies. The benefits of this concept are shown for the strategiesAvoid SoilingandHuman Strain Factor.
DOI: --
发表时间: 2001
期刊:
影响因子: --
作者:
P. Pahl;R. Damrath
通讯作者: R. Damrath
基于 4D 约束的施工规划和控制系统的需求识别
DOI: --
发表时间: 2002
期刊:
影响因子: --
作者:
E. Sriprasert;N. Dawood
通讯作者: N. Dawood
使用基于软约束的仿真进行执行策略研究
DOI: --
发表时间: 2008
期刊:
影响因子: --
作者:
U. Beißert;M. Koenig;Hans
通讯作者: Hans
利用 4D CAD/VR 工具识别和可视化施工活动的工作空间冲突
DOI: --
发表时间: 2004
期刊:
影响因子: --
作者:
Z. Mallasi
通讯作者: Z. Mallasi
规划和管理复杂的 Bauprozesse durch 模拟和修改 höheren Petri-Netzen
DOI: --
发表时间: 1989
期刊:
影响因子: --
作者:
V. Franz
通讯作者: V. Franz