Job scheduling in a group technology environment for a single facility
Job scheduling in a group technology environment for a single facility
复制标题
DOI:
10.1016/0360-8352(85)90037-3
复制
发表时间:
1985
影响因子:
7.9
通讯作者:
M. Ozden;P. Egbelu;Ananth V. Iyer
中科院分区:
文献类型:
--
作者:
M. Ozden;P. Egbelu;Ananth V. Iyer
A dynamic programming-based formulation has been developed to schedule jobs effectively in the group technology environment. The jobs may form several distinct groups to be scheduled for processing on a single facility. Switching from group to group requires a major change in the setup of the facility while jobs within a group can be accommodated with minor adjustments which take only small setup times. The group technology concept becomes a simplifying factor in the DP formulation of this scheduling problem facilitating the exact solution faster with more jobs than it was possible ever before. Computational experience with a set of example problems is also provided.