A Derivation Method for Outage Work Grid Configurations under Uncertainty of Power Sources
A Derivation Method for Outage Work Grid Configurations under Uncertainty of Power Sources
复制标题
电源不确定性下停电工作电网配置的推导方法
DOI:
10.1109/isgtasia49270.2021.9715572
复制
发表时间:
2021
期刊:
影响因子:
--
通讯作者:
Y. Sasaki and K. Kawahara
中科院分区:
文献类型:
--
作者:
Y. Zoka;S. Shigemitsu;N. Yorino;Y. Sasaki and K. Kawahara
Electric power system is one of the most essential infrastructures and regular maintenance works are very crucial tasks for transmission system operators (TSO). Maintenance works with partial outage are referred to as “outage works” and the authors have so far studied a highly reliable outage work planning for large scale power grids. In recent years, however, a huge number of photovoltaic (PV) and other renewable energy sources (RES) are being installed into the power grids. In addition, it is getting difficult for TSOs to grasp operation patterns of even traditional large-scale power sources due to the deregulation, and the planning task of annual outage work program is also getting difficult. Therefore, it is necessary to consider appropriate supply-demand conditions for obtaining reliable grid configurations during outage works even in the uncertain circumstances. In this paper, the authors investigate what kind of conditions should be assumed for outage work planning and propose a deriving method to obtain appropriate grid configurations during outage works. The effectiveness of the proposed method is verified through several numerical simulations.