Holistic Simulation of Geotechnical Installation Processes
Holistic Simulation of Geotechnical Installation Processes
复制标题
岩土安装过程的整体模拟
DOI:
--
复制
发表时间:
2015
期刊:
影响因子:
--
通讯作者:
T. Triantafyllidis
中科院分区:
文献类型:
--
作者:
T. Triantafyllidis
Travelling by car: Leave the highway A5 at the exit „Karlsruhe-Durlach“ and continue towards “Karlsruhe-Stadtmitte” (not KADurlach!). Follow the traffic signs “KIT CAMPUS SÜD” until Adenauer Ring. Leave Adenauer-Ring after about 400m at entrance 1 and follow the traffic signs for parking. Parking space is very limited and usually occupied after 8.00 a.m. since parking is free. Take care of short dated route changes due to construction works! Travelling by train: Arriving at the main station you can take either the tram line no. 2 (“Wolfartsweier”), tram line no. 4 (“Waldstadt”) or tram line no. S4 (“Bretten, Eppingen, Heilbronn”), in either case leave the tram at the stop “Durlacher Tor” (see the “H”symbol on the sketch). Walking distance about 600m to building 50.41. (Please be aware of possible changes of tram lines because of construction works!)