Energy Minimization Using Multiple Supply Voltages
Energy Minimization Using Multiple Supply Voltages
复制标题
使用多个电源电压实现能量最小化
DOI:
10.1109/lpe.1996.547499
复制
发表时间:
1996
期刊:
影响因子:
--
通讯作者:
Massoud Pedram
中科院分区:
文献类型:
--
作者:
Jui;Massoud Pedram
We present a dynamic programming technique for solving the multiple supply voltage scheduling problem in both non-pipelined and functionally pipelined data-paths. The scheduling problem refers to the assignment of a supply voltage level to each operation in a data ow graph so as to minimize the average energy consumption for given computation time or throughput constraints or both. The energy model is accurate and accounts for the input pattern dependencies, re-convergent fanout induced dependencies, and the energy cost of level shifters. Experimental results show that using four supply voltage levels on a number of standard benchmarks, an average energy saving of 53% (with a computation time constraint of 1.5 times the critical path delay) can be obtained compared to using one fixed supply voltage level.
DOI:
--
发表时间:
2003
期刊:
Proceedings of the Workshop on Synthesis and System Integration of Mixed Information Technologies
影响因子:
--
作者:
Koji Ohashi;Mineo Kaneko
通讯作者:
Mineo Kaneko