Level Schedules for Mixed-Model, Just-in-Time Processes

Level Schedules for Mixed-Model, Just-in-Time Processes
复制标题

混合模型、即时流程的级别计划

DOI:
10.1287/mnsc.39.6.728
复制
发表时间:
1993
期刊:
影响因子:
5.4
通讯作者:
S. Yeomans
S. Yeomans
中科院分区:
管理学1区
文献类型:
--
作者:
G. Steiner;S. Yeomans

文献摘要

被引文献

相似文献

在准时化生产系统下运行的混合模式制造设施通过设置最终装配过程的生产顺序来控制。这一顺序旨在实现在JIT系统下运营的组织的主要目标,即保持恒定的零件使用率。本文用图论的方法来确定一个新的非凸目标函数的最优解。此外,证明了调度总是存在的,使得在任何时候,每种产品的实际生产与期望生产水平的偏差永远不会超过一个单位。
A mixed-model manufacturing facility running under a Just-in-Time JIT production system is controlled by setting the production sequence of the final assembly process. This sequence is set to achieve the primary goal of an organization operating under a JIT system, which is to maintain a constant rate of part usage. In this paper, a graph-theoretic approach is used to determine an optimal solution for this goal for a new, nonconvex objective function. Furthermore, it is shown that a schedule always exists such that, at all times, the deviation of actual production from the desired level of production for every product is never more than one unit.