A note on the influence of missing operations on scheduling problems
A note on the influence of missing operations on scheduling problems
复制标题
关于缺失操作对调度问题的影响的注记
DOI:
--
复制
发表时间:
1982
期刊:
影响因子:
--
通讯作者:
I. Adiri
中科院分区:
文献类型:
--
作者:
N. Hefetz;I. Adiri
This paper attempts to resolve the existing confusion concerning missing operations. Scheduling problems are classified in two groups: (i) null-continuous (NC)—comprising the problems where an optimal schedule remains optimal on replacement of arbitrarily small processing times (existing operations) with zeros (missing operations); (ii) null-discontinuous (NDC)—comprising those problems which are not null-continuous.