A distributed scheduling strategy for multiple divisible loads with unknown network resources
A distributed scheduling strategy for multiple divisible loads with unknown network resources
复制标题
DOI:
--
复制
发表时间:
2009
影响因子:
--
通讯作者:
Xu Yin-long
中科院分区:
文献类型:
--
作者:
Xu Yin-long
A multi-installment load scheduling strategy was proposed based on a probing technique on heterogeneous networks with unknown network resources.This strategy divided the whole load into several sub-loads,which were distributed to processors one at a phase.In the system with unknown network resources or time-varying quantities,it took a small part of the sub-load as probing fraction to estimate the parameters of the network.Experimental results show that our strategy can obtain substantial improvement in scheduling performance.The best performance improvement is over 20%,and the average improvement is about 15%.