Mathematical Programming Solution of a Hoist Scheduling Program
Mathematical Programming Solution of a Hoist Scheduling Program
复制标题
DOI:
10.1080/05695557608975070
复制
发表时间:
1976-06
期刊:
影响因子:
--
通讯作者:
L. Phillips;P. S. Unger
中科院分区:
文献类型:
--
作者:
L. Phillips;P. S. Unger
Abstract This paper describes a mixed integer programming model of a process during which electronic circuit boards are chemically treated in a sequence of tanks. The boards must remain in these tanks for periods of time lying within specified bounds. A hoist mechanism is to be programmed to place boards into tanks, remove boards from tanks, and transport boards between tanks, so as to maximize the throughput of the system. Computational experience and a detailed example are given.