Current status of slow extraction from J-PARC Main Ring
Current status of slow extraction from J-PARC Main Ring
复制标题
J-PARC 主环缓慢撤离的现状
DOI:
10.1088/1742-6596/1350/1/012105
复制
发表时间:
2019
期刊:
影响因子:
--
通讯作者:
A. Matsumura
中科院分区:
文献类型:
--
作者:
R. Muto;Y. Arakaki;T. Kimura;S. Murasugi;M. Okada;K. Okamura;T. Shimogawa;Y. Shirakabe;M. Tomizawa;T. Toyama;E. Yanaoka;A. Matsumura
A 30 GeV proton beam accelerated in the J-PARC Main Ring (MR) is slowly extracted by the third integer resonant extraction and delivered to the hadron experimental facility. A dynamic bump scheme under achromatic condition drastically reduces beam hit rate on the septa devices, and we have attained 51 kW SX operation at 5.2 s cycle with high slow extraction efficiency of 99.5%. A spill duty factor indicating a uniformity of the time structure of the extracted beam is typically 50%. The current SX performance and future plans for improvements will be presented.
DOI:
--
发表时间:
--
期刊:
Proton Synchrotron Accepted for publication in IEEE Transactions on Applied Superconductivity
影响因子:
--
作者:
R. Muto;Y. Arakaki;K. Fan;K. Ishii;A. Kiyomichi;H. Kobayashi;H. Matsumoto;S. Murasugi;H. Nakagawa;J. Odagiri;K. Okamura;I. Sakai;H. Sato;S. Sawada;Y. Shirakabe;K.H. Tanaka;S. Tokumoto;M. Tomizawa;E. Yanaoka
通讯作者:
E. Yanaoka