A model to optimise the organisation of grid operation

A model to optimise the organisation of grid operation
复制标题

电网运行组织优化模型

DOI:
--
复制
发表时间:
2009
期刊:
影响因子:
--
通讯作者:
M. Zdrallek
M. Zdrallek
中科院分区:
--
文献类型:
--
作者:
C. Friedrich;M. Guarisco;M. Laumanns;M. Zdrallek

文献摘要

被引文献

相似文献

为了降低电网运营成本和满足监管要求,电网运营商需要分析资源的组织/使用与相应的成本/供应质量之间的关系。本文提出了一个完整的网格运行模型,该模型由计划工作和非计划工作两个模块组成。开发的模型允许优化自己的员工和设备的数量,计划和计划外的工作,以及外包策略。
In order to reduce costs for grid operation and to fulfil regulatory requirements, grid operators need to analyse the relation between the organisation/employment of resources and the corresponding costs/quality of supply. This paper presents a complete grid operation model consisting of two modules for planned and unplanned work. The developed model allows to optimise the number of own employees and equipment for planned and unplanned work as well as outsourcing strategies.