Synchronized Scheduling of Make to Order Plant and Cross-Docking Warehouse
Synchronized Scheduling of Make to Order Plant and Cross-Docking Warehouse
复制标题
订单生产工厂和越库仓库的同步调度
DOI:
10.1016/j.cie.2019.106108
复制
发表时间:
2019
影响因子:
7.9
通讯作者:
Kai Wang
中科院分区:
文献类型:
--
作者:
罗浩;杨旋;Kai Wang
To be part of very competitive supply chains, retailers and wholesalers expect small batch deliveries within short and dependable time window. Manufacturing companies have to cater to their customer’s requirement and shift their production strategy from traditional make-to-stock (MTS) to make-to-order (MTO). Meanwhile, the operation in warehouse is also changed from long term storage to short term cross-docking (CD). Based on a real-life industrial case, it can be found that, in order to achieve overall optimization, the production decision and warehouse decision should be considered simultaneously. In this paper, the specific features of synchronized production logistics scheduling in MTO plant and CD warehouse have been studied and the mathematical model of MTO-CD synchronization has been formulated. A meta-heuristic algorithm HGA-OLS has been proposed in this study. According to the computational experiments and algorithm comparison, the proposed algorithm can solve the MTO-CD synchronization problem effectively. Based on a comprehensive sensitivity analysis, some significant managerial implications have been revealed, which help the decision maker to configure the production resource and warehousing resource in different scenarios.