First Beam Commissioning of the 400 MHz LHC RF System

First Beam Commissioning of the 400 MHz LHC RF System
复制标题

400 MHz LHC 射频系统第一波束调试

DOI:
--
复制
发表时间:
2008
期刊:
影响因子:
--
通讯作者:
J. Tückmantel
J. Tückmantel
中科院分区:
--
文献类型:
--
作者:
A. Butterworth;U. Wehrle;D. Valuch;L. Arnaudon;Frode Weierud;P. Maesen;E. Shaposhnikova;J. Molendijk;F. Dubouchet;P. Baudrenghien;E. Ciapala;T. Linnecar;T. Bohl;O. Brunner;M. Angoletta;W. Höfle;J. Tückmantel

文献摘要

被引文献

相似文献

2008年9月,大型强子对撞机射频系统的硬件调试及时成功地完成了首批光束的发射。所有空腔都被调节到标称场,对电力系统进行了测试,对所有低电平同步系统、空腔控制器和光束控制电子设备进行了测试和校准。在环2中成功捕获了光束,对空腔进行了相位,并进行了一些初始测量。介绍了这些结果,并概述了2009年对撞光束的试验和准备工作。
Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities were conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controllers and beam control electronics were tested and calibrated. Beam was successfully captured in ring 2, cavities phased, and a number of initial measurements made. These results are presented and tests and preparation for colliding beams in 2009 are outlined.