RECENT PROGRESS IN BEAM COMMISSIONING OF J-PARC LINAC
RECENT PROGRESS IN BEAM COMMISSIONING OF J-PARC LINAC
复制标题
J-PARC LINAC 光束调试的最新进展
DOI:
--
复制
发表时间:
2013
期刊:
影响因子:
--
通讯作者:
J. Tamura
中科院分区:
文献类型:
--
作者:
M. Ikegami;T. Maruta;Yong Liu;K. Futatsukawa;T. Miyao;Z. Fang;A. Miura;J. Tamura
J-PARC linac resumed beam operation after the earthquake in December 2011, and the operation before the earthquake was mostly recovered until the summer shutdown in 2012 as has already been reported. We here review the progress of the linac beam commissioning thereafter, which includes beam commissioning of newly installed longitudinal monitors, high beam power operation trial, and ramp-up of the user operation beam power.