RECENT PROGRESS IN BEAM COMMISSIONING OF J-PARC LINAC

RECENT PROGRESS IN BEAM COMMISSIONING OF J-PARC LINAC
复制标题

J-PARC LINAC 光束调试的最新进展

DOI:
--
复制
发表时间:
2013
期刊:
--
影响因子:
--
通讯作者:
J. Tamura
J. Tamura
中科院分区:
--
文献类型:
--
作者:
M. Ikegami;T. Maruta;Yong Liu;K. Futatsukawa;T. Miyao;Z. Fang;A. Miura;J. Tamura

文献摘要

被引文献

相似文献

J-PARC 直线加速器在 2011 年 12 月地震后恢复了梁运行,正如已经报道的那样,直到 2012 年夏季停运之前,地震前的运行大部分已恢复。我们在这里回顾一下直线加速器波束调试的进展情况,其中包括新安装的纵向监视器的波束调试、远光功率运行试验以及用户操作波束功率的爬升。
J-PARC linac resumed beam operation after the earthquake in December 2011, and the operation before the earthquake was mostly recovered until the summer shutdown in 2012 as has already been reported. We here review the progress of the linac beam commissioning thereafter, which includes beam commissioning of newly installed longitudinal monitors, high beam power operation trial, and ramp-up of the user operation beam power.