BEAM COMMISSIONING AND OPERATION OF NEW LINAC INJECTOR FOR RIKEN RI BEAM FACTORY
BEAM COMMISSIONING AND OPERATION OF NEW LINAC INJECTOR FOR RIKEN RI BEAM FACTORY
复制标题
Riken RI 梁工厂新直线加速器的梁调试和运行
DOI:
--
复制
发表时间:
2012
期刊:
影响因子:
--
通讯作者:
Yoichi Sato
中科院分区:
文献类型:
--
作者:
K. Yamada;K. Suda;S. Arai;M. Fujimaki;T. Fujinawa;H. Fujisawa;N. Fukunishi;Y. Higurashi;E. Ikezawa;H. Imao;O. Kamigaito;M. Kase;M. Komiyama;K. Kumagai;T. Maie;T. Nakagawa;J. Ohnishi;H. Okuno;N. Sakamoto;Hiroshi Watanabe;Tamaki Watanabe;Y. Watanabe;H. Yamasawa;Yoichi Sato
A new linac injector called RILAC2 has been successfully commissioned at the RIKEN RI beam factory (RIBF). RILAC2 can accelerate very heavy ions with a mass-to-charge ratio (m/q )o f 7, such as 124 Xe 20+ and 238 U 35+ from a 28-GHz superconducting electron cyclotron resonance ion source (SC-ECRIS), up to an energy of 680 keV/u in the cw mode. The key features of RILAC2 are the powerful SC-ECRIS; improved rf voltage stability, rf phase stability, and vacuum level compared to the existing linac injector; and the compact equipment yet to be installed in the azimuthally varying field (AVF) cyclotron vault. Beam acceleration was first achieved on December 21, 2010. After conducting several beam acceleration tests in 2011, we started to operate RILAC2 to supply beams for experiments conducted at the RIBF.