Planning with Timed Literals and Deadlines

Planning with Timed Literals and Deadlines
复制标题

使用定时文字和截止日期进行规划

DOI:
--
复制
发表时间:
2003
期刊:
影响因子:
--
通讯作者:
A. Coddington
A. Coddington
中科院分区:
--
文献类型:
--
作者:
S. Cresswell;A. Coddington

文献摘要

被引文献

相似文献

本文介绍了如何PDDL2.1第3级可用于编码定时文字以及目标的最后期限,这意味着计划者已被设计为理由与PDDL2.1第3级将不需要修改,以解决问题,包含定时文字和目标的最后期限。介绍了两种编码,并给出了一些初步结果。根据这些结果,本文介绍了如何简单的修改计划LPGP使其能够更有效地解决问题,包含定时文字和目标的最后期限。
This paper describes how PDDL2.1 level 3 may be used to encode timed literals as well as goals with deadlines, which means that planners that have been designed to reason with PDDL2.1 level 3 will not need to be modified in order to solve problems containing timed literals and goals with deadlines. Two encodings are introduced and some preliminary results are presented. In light of these results the paper then describes how simple modifications made to the planner LPGP enable it to solve problems containing timed literals and goals with deadlines more effectively.