Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times

Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times
复制标题

具有与序列相关的设置时间的两阶段无等待混合流水车间调度

DOI:
10.1080/23302674.2019.1575997
复制
发表时间:
2019-02
期刊:
International Journal of Systems Science: Operations & Logistics
影响因子:
--
通讯作者:
Li Yu
Li Yu
中科院分区:
其他
文献类型:
--
作者:
Shijin Wang;Xiaodong Wang;Li Yu

文献摘要

参考文献

相似文献

研究了一类两阶段无等待混合流水车间调度问题,其中第一阶段的准备时间与顺序相关。该问题的NP难度是..
In this paper, a two-stage no-wait hybrid flow-shop scheduling problem is investigated in which the sequence-dependent setup time at the first stage is considered. The NP-hardness of the problem is...
DOI: 10.1016/j.cor.2010.10.009
发表时间: 2011-07
期刊: Comput. Oper. Res.
影响因子: --
作者:
Jaehwan Yang
通讯作者: Jaehwan Yang
DOI: 10.1007/s00170-013-5375-1
发表时间: 2014-01
期刊: The International Journal of Advanced Manufacturing Technology
影响因子: --
作者:
M. Rabiee;R. S. Rad;M. Mazinani;R. Shafaei
通讯作者: M. Rabiee;R. S. Rad;M. Mazinani;R. Shafaei
DOI: 10.1007/s00170-007-0977-0
发表时间: 2008-05
期刊: The International Journal of Advanced Manufacturing Technology
影响因子: --
作者:
Jitti Jungwattanakit;Manop Reodecha;P. Chaovalitwongse;Frank Werner
通讯作者: Jitti Jungwattanakit;Manop Reodecha;P. Chaovalitwongse;Frank Werner
DOI: 10.1016/j.apm.2013.10.061
发表时间: 2014-05
影响因子: 5
作者:
M. Ebrahimi;S. F. Ghomi;B. Karimi
通讯作者: M. Ebrahimi;S. F. Ghomi;B. Karimi
DOI: --
发表时间: 1957
期刊: --
影响因子: --
作者:
J. Munkres
通讯作者: J. Munkres