MPPO-1, Crone PEM, SP, Ground Magnetic, MIP and Turam Data Over Drilled Massive Sulphide Mineralisation at Steeple Hill, W.A.

MPPO-1, Crone PEM, SP, Ground Magnetic, MIP and Turam Data Over Drilled Massive Sulphide Mineralisation at Steeple Hill, W.A.
复制标题

DOI:
10.1071/eg978164
复制
发表时间:
1978-12
影响因子:
0.9
通讯作者:
P. Gunn;W. A. Brook
P. Gunn;W. A. Brook
中科院分区:
地球科学4区
文献类型:
--
作者:
P. Gunn;W. A. Brook

文献摘要

被引文献

相似文献

当 MPPO-1、Crone PEM、SP、MIP 和 Turam 勘测结果与钻探的块状硫化物体进行比较时,结果的一致性并不一定像地球物理专业人士希望的那样绝对一致。
When results of MPPO-1, Crone PEM, SP, MIP, and Turam surveys are compared over a drilled massive sulphide body, the consistency of the results is not necessarily as absolute as the geophysical profession may wish.