Balancing and Sequencing of Assembly Lines

Balancing and Sequencing of Assembly Lines
复制标题

DOI:
10.1007/978-3-662-00861-4
复制
发表时间:
1995-11
期刊:
--
影响因子:
--
通讯作者:
A. Scholl
A. Scholl
中科院分区:
其他
文献类型:
--
作者:
A. Scholl

文献摘要

被引文献

相似文献

它是处理两个主要的决策问题时出现的流水线生产系统的安装和操作。装配线平衡问题包括在装配线的不同工位之间划分装配产品所需的工作。如果一个产品的几个模型在一条生产线上共同加工,这个中期问题与确定模型的操作顺序的短期问题有关。在第一部分平衡和排序问题进行了讨论,分类,并安排在一个层次规划系统。在第二版中,特别强调了u形装配线,这是现代准时生产系统的重要组成部分。第二部分是关于解决这些决策问题的精确和启发式程序。对于所考虑的每种问题类型,都会对现有程序进行调查,并开发出新的有效解决方法。全面的数字调查报告。
It is dealt with two main decision problems which arise when flow-line production systems are installed and operated. The assembly line balancing problem consists of partitioning the work, necessary to assemble the product (s), among different stations of an assembly line. If several models of a product are jointly processed on a line, this medium-term problem is connected with the short-term problem of determining an operating sequence of the models. In Part I balancing and sequencing problems are discussed, classified, and arranged within a hierarchical planning system. In the second edition special emphasis is given to u-shaped assembly lines which are important components of modern just-in-time production systems. Part II is concerned with exact and heuristic procedures for solving those decision problems. For each problem type considered, a survey of existing procedures is given and new efficient solution methods are developed. Comprehensive numerical investigations are reported.