A Simple Model of Capacity Contention During New Product Introductions
A Simple Model of Capacity Contention During New Product Introductions
复制标题
新产品推出期间产能竞争的简单模型
DOI:
10.1109/tsm.2020.2981412
复制
发表时间:
2020
影响因子:
2.7
通讯作者:
R. Uzsoy
中科院分区:
文献类型:
--
作者:
A. B. Manda;R. Uzsoy
We consider the problem of determining an optimal release schedule for a production facility as it transitions from producing an older product to a newer one. We use simple queueing ideas to model the impact of the new product introduction on the throughput rate and cycle time of both products. We then incorporate the learning gained from accumulated experience in producing the new product to formulate a deterministic optimization model for release planning during product transitions. Since the model is nonlinear and non-convex we use a genetic algorithm to obtain near-optimal solutions. The structure of the optimal solution provides insights into the relationships between the different costs involved in the model. Computational experiments show that the release planning model produces high-quality solutions in reasonable CPU times, and reflects the behavior of the system realistically. The principal insight is that careful management of releases during product transitions has the potential to mitigate many of the adverse effects frequently observed in practice such as longer cycle times for both old and new products.