Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
复制标题
DOI:
10.1080/00207549108948025
复制
发表时间:
1991-07
影响因子:
9.2
通讯作者:
J. Gupta;E. Tunc
中科院分区:
文献类型:
--
作者:
J. Gupta;E. Tunc
Approximate solution algorithms are developed to find a minimum makespan schedule in a two-stage hybrid flowshop when the second stage consists of multiple identical machines. Computational experience comparing the ‘approximate’ makespans with their respective global lower bounds for large problems indicates that proposed polynomially bounded approximate algorithms are quite effective. It is shown that the proposed heuristic algorithms can be used to improve the efficiency of an existing branch and bound algorithm.