A Cooperative Coevolution Algorithm for the Seru Production With Minimizing Makespan
A Cooperative Coevolution Algorithm for the Seru Production With Minimizing Makespan
复制标题
一种最小化完工时间的血清生产协同进化算法
DOI:
10.1109/access.2018.2889372
复制
发表时间:
2019
期刊:
影响因子:
3.9
通讯作者:
Yu Yang
中科院分区:
文献类型:
--
作者:
Sun Wei;Wu Yuting;Lou Qi;Yu Yang
Seru production can be used to enhance productivity, such as makespan reduction and manpower saving. Seru system operation includes two NP-hard problems, i.e., seru formation and seru sch
登录
查看更多内容
影响因子:
6.4
作者:
Tang, Jiafu;Gong, Jun;Yin, Yong;Kaku, Ikou
通讯作者:
Kaku, Ikou
影响因子:
9.2
作者:
Yang Yu;J. Gong;Jiafu Tang;Yong Yin;I. Kaku
通讯作者:
Yang Yu;J. Gong;Jiafu Tang;Yong Yin;I. Kaku
影响因子:
12.3
作者:
Wei Du;Yang Tang;S. Leung;Le Tong;A. Vasilakos;F. Qian
通讯作者:
Wei Du;Yang Tang;S. Leung;Le Tong;A. Vasilakos;F. Qian
影响因子:
12
作者:
Jiafu Tang;Wei Sun;Yong Yin;Ikou Kaku
通讯作者:
Ikou Kaku
影响因子:
12.3
作者:
Du, Wei;Zhong, Weimin;Jin, Yaochu
通讯作者:
Jin, Yaochu