Dispatch-aware planning for feasible power system operation
Dispatch-aware planning for feasible power system operation
复制标题
DOI:
10.1016/j.epsr.2022.108597
复制
发表时间:
2022
影响因子:
3.9
通讯作者:
Nicolas H. Christianson;Lucien Werner;A. Wierman;S. Low
中科院分区:
文献类型:
--
作者:
Nicolas H. Christianson;Lucien Werner;A. Wierman;S. Low
Maintaining stable energy production with increasing penetration of variable renewable energy requires sufficient flexible generation resources and dispatch algorithms that accommodate renewables’ uncertainty. In this work, we study the feasibility properties of real-time economic dispatch (RTED) algorithms and establish fundamental limits on their performance. We propose a joint methodology for resource procurement and online economic dispatch with guaranteed feasibility. Our algorithm, Feasible Fixed Horizon Control (FFHC) is a regularized form of Receding Horizon Control (RHC) that balances exploitation of good near-term demand predictions with feasibility requirements. Empirical evaluation of FFHC in comparison to the standard RHC on realistic load profiles highlights that FFHC achieves near-optimal performance while ensuring feasibility in high-ramp scenarios where RHC becomes infeasible.