Data-Driven Reverse Engineering Algorithm Development Method for Developing Interoperable Quantity Takeoff Algorithms Using IFC-Based BIM

Data-Driven Reverse Engineering Algorithm Development Method for Developing Interoperable Quantity Takeoff Algorithms Using IFC-Based BIM
复制标题

DOI:
10.1061/(asce)cp.1943-5487.0000909
复制
发表时间:
2020-09
期刊:
J. Comput. Civ. Eng.
影响因子:
--
通讯作者:
Temitope Akanbi;Jiansong Zhang;Yong-Cheol Lee
Temitope Akanbi;Jiansong Zhang;Yong-Cheol Lee
中科院分区:
其他
文献类型:
--
作者:
Temitope Akanbi;Jiansong Zhang;Yong-Cheol Lee

文献摘要

被引文献

相似文献

摘要建筑工程量自动化(QTO)的一个主要差距是缺乏一个系统的方法来解决从不同的BIM创作工具创建的建筑信息模型(BIM)。
AbstractOne main gap in the automation of construction quantity takeoff (QTO) is the lack of a systematic method to address building information models (BIMs) created from different BIM authoring t...