H(2)-unknotting operation related to 2-bridge links
H(2)-unknotting operation related to 2-bridge links
复制标题
H(2)-与 2 桥链路相关的解结操作
DOI:
10.1016/j.topol.2012.02.008
复制
发表时间:
2012
影响因子:
0.6
通讯作者:
Yuanyuan Bao
中科院分区:
文献类型:
--
作者:
T. Nomoto;S. Fukushima;M. Kumagai;K. Machitani;Arnida;Y. Matsumoto;M. Oba;K. Miyata;K. Osada;N. Nishiyama;K. Kataoka;Yuanyuan Bao
This paper concerns the H(2)-unknotting numbers of links related to 2-bridge links. It consists of three parts. In the first part, we consider a necessary and sufficient condition for a 2-bridge link to have H(2)-unknotting number one. The second part concerns an explicit form of composite links with H(2)-unknotting number one. In the last part, we develop a method of studying the H(2)-unknotting numbers of some tangle unknotting number one knots via 2-bridge knots.