Seru loading with worker-operation assignment in single period

Seru loading with worker-operation assignment in single period
复制标题

DOI:
10.1109/ieem.2016.7798039
复制
发表时间:
2016-12
期刊:
2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
影响因子:
--
通讯作者:
L. Luo;Z. Zhang;Y. Yin
L. Luo;Z. Zhang;Y. Yin
中科院分区:
其他
文献类型:
--
作者:
L. Luo;Z. Zhang;Y. Yin

文献摘要

被引文献

相似文献

Seru生产系统是日本发展起来的一种能够同时实现柔性和高效的新型生产组织形式,Seru被认为是实现大规模定制的理想生产模式。然而,血清生产的理论研究还不足以指导生产实践。在本文中,我们将考虑单个周期内工人操作分配的血清加载问题。提出了专门针对该问题的数学模型,然后设计了启发式算法来求解所提出的模型。最后通过数值算例验证了模型和算法的实用性和有效性。
Seru production system, which can achieve flexibility and efficiency at the same time, is a new form of production organization developed in Japan, and seru is regarded as an ideal production mode for realizing mass customization. However, theoretical research for seru production is not sufficient enough to guide the production practice. In this paper, we will consider a seru loading problem with worker-operation assignment in a single period. A mathematical model is proposed dedicated for the problem, and then, a heuristic algorithm is designed to solve the proposed model. Finally, the practicality and effectiveness of the model and algorithm are verified by a numerical example.