Scheduling algorithms to minimize utility work at a single station on a paced assembly line
Scheduling algorithms to minimize utility work at a single station on a paced assembly line
复制标题
调度算法可最大限度地减少定速装配线上单个工作站的公用事业工作
DOI:
--
复制
发表时间:
1992
期刊:
影响因子:
--
通讯作者:
C. Yano
中科院分区:
文献类型:
--
作者:
A. Bolat;C. Yano
Abstract Abstract. In this article we address the problem of sequencing jobs for one station on a paced assembly line with no buffers, at which two types of operations can be performed. If a subsequence of jobs requires more work than the station can handle, some amount of work, which we call utility work, will remain undone. We develop optimal solution procedures for three of four mutually exclusive and collectively exhaustive problem subclasses, with the goal of minimizing total utility work. For the fourth subclass, we evaluate heuristics that are structurally similar to the optimal procedures for the other subclasses. We provide worst-case error bounds for one of these procedures. Computational results indicate that very good, and often optimal, results can be obtained with a combination of these procedures.