High heat flux test with HIP bonded Be/Cu mock-ups for the ITER first wall

High heat flux test with HIP bonded Be/Cu mock-ups for the ITER first wall
复制标题

DOI:
10.1016/j.fusengdes.2009.03.010
复制
发表时间:
2008-12
期刊:
2009 23rd IEEE/NPSS Symposium on Fusion Engineering
影响因子:
--
通讯作者:
Dong Won Lee;Y. Bae;Suk-Kwon Kim;B. Hong;H. Jung;J. Park;Y. Jeong;Byung-Kwon Choi
Dong Won Lee;Y. Bae;Suk-Kwon Kim;B. Hong;H. Jung;J. Park;Y. Jeong;Byung-Kwon Choi
中科院分区:
其他
文献类型:
--
作者:
Dong Won Lee;Y. Bae;Suk-Kwon Kim;B. Hong;H. Jung;J. Park;Y. Jeong;Byung-Kwon Choi

文献摘要

被引文献

相似文献

In order to verify the integrity of the first wall (FW) of the International Thermonuclear Experimental Reactor (ITER), especially for preparing its qualification program by ITER-O, Be/Cu/SS mock-ups, which were the same size as the qualification mock-ups, were fabricated and tested at the TSEFEY, an e-beam facility, in Efremov, Russia. These mock-ups were joined with a 316L austenitic stainless steel (SS316L) block for a structural material, CuCrZr for a heat sink material and SS316L tubes for a coolant and then, joined with three Be tiles for an armor material. A hot isostatic pressing (HIP) was used as manufacturing methods at a 1050°C, 100MPa for 2h for a Cu/SS joining and at a 580°C, 100MPa for 2h for a Be/(Cu/SS) joining. Two mock-ups were fabricated by using 1μmCr/10μmCu of an interlayer between the Be tile and Cu block. The high heat flux (HHF) tests were performed at 1.5 and 2.0MW/m2heat fluxes for each mock-up. The given conditions and the expected fatigue lifetime were evaluated from a preliminary analysis with ANSYS. Both mock-ups survived for up to 1000 and 268 cycles at 1.5 and 2.0MW/m2heat fluxes, respectively. They are higher than the expected numbers of cycles to a failure.