THE NEW ONTARIO BRIDGE MANAGEMENT SYSTEM

THE NEW ONTARIO BRIDGE MANAGEMENT SYSTEM
复制标题

新的安大略省桥梁管理系统

DOI:
--
复制
发表时间:
2000
期刊:
--
影响因子:
--
通讯作者:
R. Ellis
R. Ellis
中科院分区:
--
文献类型:
--
作者:
P. Thompson;T. Merlo;B. Kerr;A. Cheetham;R. Ellis

文献摘要

被引文献

相似文献

安大略省交通部(MTO)负责管理省公路网上大约3000座桥梁。近年来,运输部一直根据自身的需要,评估桥梁管理系统(bms)的发展。国防部决定开发一种全新的系统,在网络级功能上类似于其他国家开发的现代系统,但在项目级能力上比任何现有系统都更详细。它将建立在卫生部过去十年在治疗选择、有效性和成本方面进行的大量研究的基础上。该部委托ITX Stanley有限公司在1998年1月开始的一个项目中提供这种称为OBMS的工具,该项目将于1999年年底完成。OBMS用Visual Basic编写,用于客户机-服务器部署,是一个全新的系统,而不是对任何现有系统的改编。它的特点是以知识为基础的方法来选择处理方法,并以投标项目为基础进行直接和间接的成本估算,为工程部门的工程检查员在现场提供项目级决策支持。完全集成到工程师的OBMS桌面上的是来自交通部地理信息系统的桥梁和非桥梁数据的电子地图;输入和输出电子文件,包括检查照片;以及维护和修复的历史数据。面向对象的设计和开发方法为用户界面设计、系统集成以及项目和网络级别的快速循环分析优化提供了创新的方法。
Ontario's Ministry of Transportation (MTO) is responsible for the management of approximately 3000 bridges on the provincial highway network. The MTO in recent years has been evaluating developments in Bridge Management Systems (BMSs) in relation to its own requirements. The Ministry decided to develop an all-new system, similar in network-level functionality to modern systems developed in other countries, but more detailed in its project-level capabilities than any existing system. It would build on a substantial body of research conducted by the Ministry over the past decade in the subjects of treatment selection, effectiveness, and costing. The Ministry engaged ITX Stanley, Ltd., to provide this tool, to be called OBMS, in a project which began in January of 1998 and is due to be completed by the end of 1999. Written in Visual Basic for client-server deployment, OBMS is a completely new system from the ground-up, and not an adaptation of any existing system. It features a knowledge-based approach to treatment selection, and a tender item basis for direct and indirect cost estimation, for project-level decision support to the Ministry's engineer-inspectors in the field. Fully integrated into the engineer's OBMS desktop are electronic maps of bridge and non-bridge data from the Ministry's geographic information system; input and output of electronic documents, including inspection photographs; and historical data on maintenance and rehabilitation. Object-oriented methods for design and development have provided innovative approaches to user interface design, system integration, and rapid analyst-in-the-loop optimization at both the project and network levels.