Assessment of weather downtime for the construction of offshore wind farm by using wind and wave simulations
Assessment of weather downtime for the construction of offshore wind farm by using wind and wave simulations
复制标题
利用风浪模拟评估海上风电场建设的天气停机时间
DOI:
10.1088/1742-6596/753/9/092016
复制
发表时间:
2016
期刊:
影响因子:
--
通讯作者:
T. Ishihara
中科院分区:
文献类型:
--
作者:
Yuka Kikuchi;T. Ishihara
In this study, numerical simulations for winds and waves were carried out using WRF and WW3 and the predicted wind speed, wave height and wave period were validated with measurement. Annual average values of absolute monthly error of wind speed, wave height and wave period were 4.30%, 12.3% and 7.8%. The prediction accuracy were improved by bias modification in the region of low wave height and short wave period. Predicted seasonal frequency distributions showed good agreement with measurements. The criteria of experienced construction methods were investigated at Choshi and Kitakyushu wind farm and the sensitivity of environmental conditions on weather downtime were clarified. At Choshi, the weather downtime was predicted by using wind and wave simulations and showed good agreement with the actual weather downtime.