Investigation of high duty factor ISR RFQ-1000 $
Investigation of high duty factor ISR RFQ-1000 $
复制标题
DOI:
10.1016/j.nima.2003.07.025
复制
发表时间:
2003-12
影响因子:
1.4
通讯作者:
Yuanrong Lu;C. E. Chen;J. Fang;Shuli Gao;Jimei Guo;Zhiyu Guo;Dongyu Li;Wei Li;O. J. Pan;X. Ren;Yue-fang Wu;Xueqing Yan;Jinxiang Yu;M. Yu;U. Ratzinger;H. Deitinghoff;H. Klein;A. Schempp
中科院分区:
文献类型:
--
作者:
Yuanrong Lu;C. E. Chen;J. Fang;Shuli Gao;Jimei Guo;Zhiyu Guo;Dongyu Li;Wei Li;O. J. Pan;X. Ren;Yue-fang Wu;Xueqing Yan;Jinxiang Yu;M. Yu;U. Ratzinger;H. Deitinghoff;H. Klein;A. Schempp
Two Integral Split Ring (ISR) RFQs with high duty factor of 16.7% have been designed for the application of heavy ion implantation and built in the past several years at Institute of Heavy Ion Physics (IHIP) in Peking University. Two kinds of PIG ion sources with permanent magnets and LEBT were installed and optimized for the injection into these two RFQs. The positive O+and negative O−ions were extracted and accelerated separately as well as simultaneously. The output macro pulse O−beam current reached 660μA at a transmission efficiency of more than 82%. The N+beam was also accelerated with similar transmission efficiency, but the output current intensity for positive ions were lower than the negative ions because of the extracted current limitation of ion sources. The improvements, especially for high duty factor and experimental results with the 1MeV ISR RFQ will be presented in this paper.