Thermal Behavior in Cross-Passage Construction during Artificial Ground Freezing: Case of Harbin Metro Line

Thermal Behavior in Cross-Passage Construction during Artificial Ground Freezing: Case of Harbin Metro Line
复制标题

DOI:
10.1061/(asce)cr.1943-5495.0000221
复制
发表时间:
2020-09
影响因子:
2
通讯作者:
Zhiming Li;Jian Chen;M. Sugimoto;Chaojun Mao
Zhiming Li;Jian Chen;M. Sugimoto;Chaojun Mao
中科院分区:
工程技术4区
文献类型:
--
作者:
Zhiming Li;Jian Chen;M. Sugimoto;Chaojun Mao

文献摘要

相似文献

富水砂层中联络通道的成功施工,需要对通道区土体进行地基加固。为了解决这些问题,人工冻结...
Abstract The successful construction of cross passages in water-rich sand strata requires the ground reinforcement of soil in passage zones. To address these conditions, artificial ground freezing ...