Phasor assisted state estimation for NYS transmission system --Implementation & testing
Phasor assisted state estimation for NYS transmission system --Implementation & testing
复制标题
纽约州输电系统相量辅助状态估计--实现
DOI:
--
复制
发表时间:
2009
期刊:
影响因子:
--
通讯作者:
B. Fardanesh
中科院分区:
文献类型:
--
作者:
A. Ghassemian;B. Fardanesh
This paper describes the implementation, testing, and performance of phasor measurements in an industrial state estimation at the New York Power Authority (NYPA). Phasor Measurement Units (PMU) with GPS synchronization were incorporated into the data acquisition subsystem of the Energy Management System (EMS). The modified State Estimator was subjected to pre- and post-field installation testing. The pre-field installation testing was done to verify the correctness of the solution algorithm, to identify the impact of phasor metering accuracy on the quality of estimator solution, to show the relative effectiveness of phasor measurements with respect to other measurements, to identify the effect of the reference bus selection, to detect the impact of PMUs on the State Estimator convergence, and to establish the minimum clock synchronization sampling accuracy required for the PMUs [10]. The post-field installation tests were conducted to identify the effectiveness of the PMUs in the State Estimator solution using the real-time data as well as to detect the effect of time skewing and measurement weights on the State Estimator solution.