Modular Joint for the Accelerated Fabrication and Erection of Steel Bridges

Modular Joint for the Accelerated Fabrication and Erection of Steel Bridges
复制标题

用于加速钢桥制造和安装的模块化接头

DOI:
10.1061/(asce)be.1943-5592.0001706
复制
发表时间:
2021
影响因子:
3.6
通讯作者:
T. Zoli
T. Zoli
中科院分区:
工程技术2区
文献类型:
--
作者:
Mirela D. Tumbeva;A. P. Thrall;T. Zoli

文献摘要

参考文献

被引文献

相似文献

摘要本文介绍了一种新的钢桥快速制造和安装的策略:模块化节点。模块化节点是一种预制的节点连接器,由一个井...
Abstract This paper introduces a new strategy for the accelerated fabrication and erection of steel bridges: a modular joint. The modular joint is a prefabricated, nodal connector composed of a wel...
DOI: 10.1061/(asce)st.1943-541x.0002440
发表时间: 2020
影响因子: 4.1
作者:
Gerbo, Evan J.;Thrall, Ashley P.;Zoli, Theodore P.
通讯作者: Zoli, Theodore P.
DOI: 10.1061/(asce)st.1943-541x.0001965
发表时间: 2018
影响因子: 4.1
作者:
Gerbo, Evan J.;Wang, Yao;Tumbeva, Mirela D.;Thrall, Ashley P.;Smith, Brian J.;Zoli, Theodore P.
通讯作者: Zoli, Theodore P.
DOI: 10.1061/(asce)st.1943-541x.0002203
发表时间: 2018-11-01
影响因子: 4.1
作者:
Chen, Justin G.;Adams, Travis M.;Buyukozturk, Oral
通讯作者: Buyukozturk, Oral
DOI: 10.1061/(asce)st.1943-541x.0002635
发表时间: 2020
影响因子: 4.1
作者:
Gerbo, Evan J.;Thrall, Ashley P.;Zoli, Theodore P.
通讯作者: Zoli, Theodore P.