PROGRESS IN SRF CH-CAVITIES FOR THE HELIAC CW LINAC AT GSI
PROGRESS IN SRF CH-CAVITIES FOR THE HELIAC CW LINAC AT GSI
复制标题
GSI 的 HELIAC CW 直线加速器 SRF CH 腔的进展
DOI:
--
复制
发表时间:
2019
期刊:
影响因子:
--
通讯作者:
S. Yaramyshev
中科院分区:
文献类型:
--
作者:
M. Miski;K. Aulenbacher;W. Barth;M. Basten;C. Burandt;M. Busch;T. Conrad;F. Dziuba;V. Gettmann;M. Heilmann;T. Kuerzeder;J. List;S. Lauber;H. Podlech;A. Rubin;A. Schnase;M. Schwarz;S. Yaramyshev
The machine beam commissioning is a major milestone of the R&D for the superconducting heavy ion continuous wave linear accelerator HELIAC (HElmholtz LInear ACcelerator) of Helmholtz Institute Mainz (HIM) and GSI, developed in collaboration with IAP Goethe-University Frankfurt . During successful beam commissioning of the superconducting 15-gap Crossbar H-mode cavity at GSI Helmholtzzentrum für Schwerionenforschung heavy ions up to the design beam energy have been accelerated. The design acceleration gain of 3.5 MeV has been reached with full transmission for heavy ion beams of up to 1.5 pμA. Fabrication experiences and results of off-line and on-line cavity performance will be presented. The next step is the procurement and commissioning of so called ’Advanced Demonstrator’ the first of series cryomodule for the entire accelerator HELIAC. Results of further Demonstrator beam tests, as well as the status of the Advanced demonstrator project will be reported.
DOI:
--
发表时间:
--
期刊:
影响因子:
--
作者:
通讯作者:
--
DOI:
--
发表时间:
--
期刊:
影响因子:
--
作者:
通讯作者:
--
DOI:
--
发表时间:
--
期刊:
影响因子:
--
作者:
通讯作者:
--