Takt Time Planning for Construction of Exterior Cladding

Takt Time Planning for Construction of Exterior Cladding
复制标题

外墙施工节拍时间规划

DOI:
--
复制
发表时间:
2013
期刊:
影响因子:
--
通讯作者:
Iris D. Tommelein
Iris D. Tommelein
中科院分区:
--
文献类型:
--
作者:
Adam G. Frandson;Klas Berghede;Iris D. Tommelein

文献摘要

被引文献

相似文献

本文介绍了概念和采取的步骤,以及生产调度的案例研究,实施节拍时间的使用。它首先概述了传统的施工调度,并与使用节拍时间的生产调度进行对比。然后介绍了一个节拍时间调度的过程,并通过案例研究说明了它的应用。节拍时间用于驱动加州萨克拉门托的医疗机构上的外部覆层系统的安装。由于使用了四天节拍的生产计划,传统的11个月部分完成外部的施工时间表缩短至5.5个月。本案例研究说明了节拍时间的成功开发和应用,挑战,好处和经验教训。
This paper presents the concept and steps taken, as well as a case study on production scheduling, to implement the use of Takt time. It starts with an overview of traditional construction scheduling and contrasts that with the use of production scheduling using Takt time. It then presents a process for Takt time scheduling and illustrates its application by means of a case study. Takt time was used to drive installation of the exterior cladding system on a healthcare facility in Sacramento, California. Thanks to the use of a production schedule with a four-day Takt, the traditional construction schedule of 11 months for partial completion of the exteriors was reduced to 5.5 months. This case study illustrates the successful development and application of Takt time, challenges, benefits, and lessons learned.