Takt Time Planning for Construction of Exterior Cladding
Takt Time Planning for Construction of Exterior Cladding
复制标题
外墙施工节拍时间规划
DOI:
--
复制
发表时间:
2013
期刊:
影响因子:
--
通讯作者:
Iris D. Tommelein
中科院分区:
文献类型:
--
作者:
Adam G. Frandson;Klas Berghede;Iris D. Tommelein
This paper presents the concept and steps taken, as well as a case study on production scheduling, to implement the use of Takt time. It starts with an overview of traditional construction scheduling and contrasts that with the use of production scheduling using Takt time. It then presents a process for Takt time scheduling and illustrates its application by means of a case study. Takt time was used to drive installation of the exterior cladding system on a healthcare facility in Sacramento, California. Thanks to the use of a production schedule with a four-day Takt, the traditional construction schedule of 11 months for partial completion of the exteriors was reduced to 5.5 months. This case study illustrates the successful development and application of Takt time, challenges, benefits, and lessons learned.