INCREMENTAL OPEN-PIT MINING OF STEEPLY DIPPING ORE DEPOSITS
INCREMENTAL OPEN-PIT MINING OF STEEPLY DIPPING ORE DEPOSITS
复制标题
急倾斜矿床的增量露天开采
DOI:
--
复制
发表时间:
2020
期刊:
影响因子:
--
通讯作者:
M. P. Ovsyannikov
中科院分区:
文献类型:
--
作者:
S. Fomin;V. Ivanov;A. Semenov;M. P. Ovsyannikov
Great opportunities for improving the open-pit mining operations technology and increasing their efficiency are laid in the temporary conservation of overburden rocks and leaving a temporary basset edge within the quarry. This is due to the desire to reduce the volume of mining and stripping operations in the initial periods of quarries exploitation. To reduce costs, it is advisable to plan incremental surface mining with the establishment of pushbacks. Phased formation dynamics of the working zone of opencasts and development technologies should ensure the implementation of the projected volumes of mining and the possibility of their simultaneous intensive development within the boundaries of different stages. There are objective trends of deterioration of mining-and-engineering and mining-and-geological conditions of open-cut mining of steeply dipping deposits, in the context of dynamic markets, changes in prices, and demand for mineral raw materials. The creation of stages and pillars may be caused by the decision to reconstruct the quarry. In this case, an existing final pit boundary will serve a pushback. The process of creating a temporary basset edge was carried out when the movement of the loading faces reached the mine abandoning stage. Development of deposits in stages allows in some cases ensuring the economic feasibility of mining, and the necessary rate of return. The authors proved the necessity of forming a temporal basset edge of ore in the context of changing economic situations.