Measuring airborne asbestos following an abatement action

Measuring airborne asbestos following an abatement action
复制标题

减排行动后测量空气中的石棉

DOI:
--
复制
发表时间:
1985
期刊:
影响因子:
--
通讯作者:
M. Beard
M. Beard
中科院分区:
--
文献类型:
--
作者:
D. Keyes;J. J. Breen;M. Beard

文献摘要

被引文献

相似文献

石棉消除项目中最关键的一点是知道工作何时完成,承包商可以被释放,建筑物可以重新占用。这一决定应基于两个因素:(1)消除工作的满意表现,以及(2)彻底清洁工作现场。如本文所述,这些因素应通过实际检查工作现场和测量空气中石棉的水平进行评估。评估应由石棉项目经理或被指派监督消除工作的技术顾问进行。报告讨论了有关空气试验的各种技术问题。提供了空气采样的规范,并提出了使用TEM或PCM分析样品的详细指南。该信息是专为石棉项目经理和技术项目顾问。
One of the most critical points in an asbestos abatement project is knowing when the work has been completed, the contractor can be released, and the building can be reoccupied. This decision should be based on two factors: (1) satisfactory performance of the abatement work, and (2) thorough cleaning of the work site. As outlined herein, these factors should be evaluated by virtually inspecting the work site and by measuring the level of airborne asbestos there. The evaluation should be conducted by the asbestos program manager or the technical advisor assigned to monitor the abatement work. The report discusses various technical issues regarding the air test. Specifications are provided for air sampling and detailed guidelines are presented for using either TEM or PCM to analyze the samples. The information is designed for asbestos program managers and technical program advisors.