BESIII ETOF upgrade readout electronics commissioning
BESIII ETOF upgrade readout electronics commissioning
复制标题
DOI:
10.1088/1674-1137/41/1/016103
复制
发表时间:
2017-01
影响因子:
3.6
通讯作者:
Xiaozhuang Wang;H. Dai;Zhi Wu;Y. Heng;Jie Zhang;P. Cao;X. Ji;Cheng Li;Weijia Sun;
中科院分区:
文献类型:
--
作者:
Xiaozhuang Wang;H. Dai;Zhi Wu;Y. Heng;Jie Zhang;P. Cao;X. Ji;Cheng Li;Weijia Sun;
It is proposed to upgrade the endcap time-of-flight (ETOF) of the Beijing Spectrometer III (BESIII) with a multi-gap resistive plate chamber (MRPC), aiming at an overall time resolution of about 80 ps. After completing the entire readout electronics system, some experiments, such as heat radiation, radiation hardness and large-current beam tests, have been carried out to confirm the reliability and stability of the readout electronics. An on-detector test of the readout electronics has also been performed with the beam at the BEPCII E3 line. The test results indicate that the readout electronics system fulfills its design requirements.