Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem

Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem
复制标题

基于改进扩展转移瓶颈程序和遗传算法的装配车间调度问题混合算法

DOI:
10.1080/00207543.2019.1622052
复制
发表时间:
2019-05
影响因子:
9.2
通讯作者:
Yue Meng
Yue Meng
中科院分区:
工程技术2区
文献类型:
--
作者:
Fei Shi;Shikui Zhao;Yue Meng

文献摘要

参考文献

被引文献

相似文献

以完工时间为优化目标,针对装配车间调度问题(AJSSP),我们提出了一种将改进的扩展转移瓶颈程序(i-ESB)和遗传算法(GA)相结合的混合求解方法。混合遗传算法
With the makespan as the optimisation goal, we propose a hybrid solving method that combines improved extended shifting bottleneck procedure (i-ESB) and genetic algorithm (GA) for the assembly job shop scheduling problem (AJSSP). Hybrid genetic algorithm
DOI: --
发表时间: 2014
期刊: Computer Integrated Manufacturing Systems
影响因子: --
作者:
Wang Xiao-yua
通讯作者: Wang Xiao-yua
DOI: 10.5353/th_b4702901
发表时间: 2011
期刊: --
影响因子: --
作者:
Hai-peng Lü;吕海利
通讯作者: Hai-peng Lü;吕海利
DOI: 10.1080/002075498192922
发表时间: 1998-08
影响因子: 9.2
作者:
D. Cummings;Mckoy P. J. Egbelu
通讯作者: D. Cummings;Mckoy P. J. Egbelu
DOI: 10.1016/0377-2217(95)00353-3
发表时间: 1996-04
影响因子: 6.4
作者:
P. Ivens;M. Lambrecht
通讯作者: P. Ivens;M. Lambrecht
DOI: 10.1080/00207540310001595864
发表时间: 2003-12
影响因子: 9.2
作者:
S. Thiagarajan;C. Rajendran
通讯作者: S. Thiagarajan;C. Rajendran