Simulation and optimization in an AGC system after deregulation

Simulation and optimization in an AGC system after deregulation
复制标题

DOI:
10.1109/pica.2001.932329
复制
发表时间:
2001
期刊:
PICA 2001. Innovative Computing for Power - Electric Energy Meets the Market. 22nd IEEE Power Engineering Society. International Conference on Power Industry Computer Applications (Cat. No.01CH37195)
影响因子:
--
通讯作者:
V. Donde;M. Pai;I. Hiskens
V. Donde;M. Pai;I. Hiskens
中科院分区:
其他
文献类型:
--
作者:
V. Donde;M. Pai;I. Hiskens

文献摘要

被引文献

相似文献

* DISCO可在其自己的控制区域和/或其他区域中具有与GENCO匹配的负荷控制。这些合同必须通过M公正实体进行结算:IS 0幻灯片2概述电力行业和双边交易的放松管制结构DISCO参与矩阵双边交易AGC框图模拟轨迹灵敏度使用轨迹灵敏度调整反馈参数以获得最佳性能 * 总结
* DISCOs may have load matclung COntrQdS with GENCOs in their own control area and/or in other areas. These contracts have to be cleared through M impartial entity: IS0 Slide 2 Outline Deregulated structure of power industry and bilateral transactions DISCO participation matrix AGC block diagram with bilateral transactions Simulation Trajectory sensitivities Tuning feedback parameters for optimum performance using trajectory sensitivities * Summary