The design, construction and performance of the MICE target

The design, construction and performance of the MICE target
复制标题

DOI:
10.1088/1748-0221/8/03/p03006
复制
发表时间:
2012-11
影响因子:
1.3
通讯作者:
C. Booth;P. Hodgson;L. Howlett;R.Nicholson;E. Overton;M. Robinson;P. Smith;M. Apollonio;G. Barber;A. Dobbs;J. Leaver;K. Long;B. Shepherd;D. Adams;E. Capocci;E. McCarron;J. T. U. O. Sheffield;I. -. London;Stfc Daresbury Laboratory;Stfc Rutherford Appleton Laboratory
C. Booth;P. Hodgson;L. Howlett;R.Nicholson;E. Overton;M. Robinson;P. Smith;M. Apollonio;G. Barber;A. Dobbs;J. Leaver;K. Long;B. Shepherd;D. Adams;E. Capocci;E. McCarron;J. T. U. O. Sheffield;I. -. London;Stfc Daresbury Laboratory;Stfc Rutherford Appleton Laboratory
中科院分区:
工程技术4区
文献类型:
--
作者:
C. Booth;P. Hodgson;L. Howlett;R.Nicholson;E. Overton;M. Robinson;P. Smith;M. Apollonio;G. Barber;A. Dobbs;J. Leaver;K. Long;B. Shepherd;D. Adams;E. Capocci;E. McCarron;J. T. U. O. Sheffield;I. -. London;Stfc Daresbury Laboratory;Stfc Rutherford Appleton Laboratory

文献摘要

被引文献

相似文献

为MICE Muon束提供服务的介子生产目标包括一个浸入ISIS质子束光晕中的钛圆柱体。描述了MICE靶标系统的设计和结构,以及质量保证程序、电磁驱动和控制系统、读出电子学和数据采集系统。靶子的性能与提供给MICE Muon束的粒子率一起给出。最后,计算了目标在ISIS中运行时产生的束流损耗随粒子速率的变化关系,并推导出了目标的运行参数。
The pion-production target that serves the MICE Muon Beam consists of a titanium cylinder that is dipped into the halo of the ISIS proton beam. The design and construction of the MICE target system are described along with the quality-assurance procedures, electromagnetic drive and control systems, the readout electronics, and the data-acquisition system. The performance of the target is presented together with the particle rates delivered to the MICE Muon Beam. Finally, the beam loss in ISIS generated by the operation of the target is evaluated as a function of the particle rate, and the operating parameters of the target are derived.